Adept HSG protect flanges on hot oil pipeline
Following a call from a local customer who had been visited by the HSE we were tasked with surveying a hot oil pipeline with a view to offering blowout containment of flanges. We attended site same day, measured up and offered Sureband Steel. Within 4 days all FlangeGuards were onsite and the HSE requirements were fulfilled. If you have any unprotected flanges near walkways or containing hot oil or flammable products get in touch today.